INSTALLATION PROCESS OF LOW CEMENT CASTABLE
1. Drinking water standards PH 6-7. control water addition strictly
2. Installation temperature should between 15ºC-30ºC, idea condition is 21ºC. Use extra heater when temperature is below request
3. Mixing time 5-10min, no more than 10min. Casting within 30min
4.Vibration is important for low water addition materials,move vibrator up and down in castable, take it out slowly when finish.
5. Demould can be done 18-24 hrs after casting according to each application. Material must be fully solid,and avoid damaging lining surface when demouldling.
6. Maintain in natural condition for 24-72hrs before sintering.
 
A
 
 
We could not find any corresponding parameters, please add them to the properties table
ewm
WeChat public account
ewm
View mobile website

Contact Us

Address : No. 99, Yiqing Road, Gaozi Street, EconomicDevelopment Zone, Dantu District, Zhenjiang City

Fax : +86-511-85683066
E-mail :
sales@sfr168.com   
Website :
http://www.sfr168.com
Copyright © 2021 Sino-Foundry Refractory(Jiangsu) Co.,Ltd. All Rights Reserved. 苏ICP备19058941号-1 Powered by:www.300.cn Changzhou
返回顶部
搜索
Search